9.2. Managing scheduled reports

The Scheduled reports sub-tab gives a tabular view of all the reports that have been confiured to run on a schedule. The table includes a row for each scheduled report. For each currently scheduled report, the table gives the current state of the report, the schedule the report is running on (in cron syntax), when the report was last run on the schedule, and how long it took to run.

The state of a scheduled will be shown as Time exceeded if, when the last time the report was run on the schedule, the configured Max run time was exceeded and the report run was cancelled automatically.

The state of a scheduled will be shown as Cancelled if, when the last time the report was run on the schedule, the report was cancelled manually while it was running (see Section 9.2.1, “Cancelling a running scheduled report ).

Clicking on the report name will take you to the Reports sub-tab with the report selected so you can easily view and edit the report definition and settings.

9.2.1. Cancelling a running scheduled report

When a report is being run on the configured schedule, the table will show the report state as Running. To cancel the running scheduled report, click on shown in the last column of the row for the report.